Project development

AP / PB / PBE / PR

Purpose

Documentation support in the phase your team needs.

Quick answers

What

Development of documentation for concept, basic, basic-and-construction or refurbishment stages.

When

When the team needs to reinforce the production of one specific phase.

How

We set what the phase means and what it includes, and we develop the documentation under the rules of the responsible team.

Why

A specific phase can be covered with extra capacity without losing consistency with the project.

Who is it for

Studios and teams that need short support on one defined phase.

Scope

Deliverables

Procedure

  1. Scope

    We set which phase the commission covers and which documents it includes, under the rules of the responsible team.

  2. Production

    We develop the documentation of the agreed phase and incorporate the changes indicated.

  3. Check and delivery

    We review consistency and completeness within the scope and deliver with the open questions.

Rates

See rates

Tools

BIM · CAD · CDE

Frequently asked questions

How is this service priced?

By the phase and the documentary scope agreed. The figure comes from the current rate, or as a closed price.

What does each abbreviation mean?

AP concept, PB basic design, PBE basic and construction, PR refurbishment. The exact meaning and scope are fixed in the commission.

Related services

Act

Tell me about your project ↗